Rail Infrastructure
Contributions to complex projects
The Betta Group carries out civil and infrastructural works as part of complex railway projects.
With over 8 years of experience with our client, Aurizon, we offer an approach that guarantees safety, through our long term, qualified, effective & efficient team members.
We execute a wide range of work, like construction and installation of rail signalling and control infrastructure, construction of rail overhead, line equipment (OHLE) foundation & infrastructure and fibre optic cabling installation.
RAIL INFRASTRUCTURE PROJECTS

Tryphinia Project
Aurizon- Separable Portion No. 01 – Tryphinia Train Detection
- Separable Portion No. 02 – Tryphinia Road Level Crossing
- Separable Portion No. 03 – Mourandilla Road Level crossings
- Separable Portion No. 04 – Wallaroo Feeder Station and Dingo SER Optic fibre Installation
Value – $2.6M

Callemondah Yard Upgrade Project
Aurizon- Stage 1A Copper & fibre cabling works, Pit and pipe installation, Signalling equipment Hut foundation
- Stage 1B Copper & fibre cabling works, Pit and pipe installation, Signalling equipment Hut foundation
- Stage 1C Copper & fibre cabling works, Pit and pipe installation, Signalling equipment Hut foundation

Wotonga & Moranbah Yard Project
Aurizon- Train detection
- Axel counter upgrade
- Trackside equipment cabinet installation
- Copper & fibre cabling works
- Pit and pipe installation
Value – $800k

Collinsville SER Project
Aurizon- Copper & fibre cabling works
- Pit and pipe installation
- Signalling equipment
- Hut foundation
Value – $400k

Bowen Rail Network Upgrade
Aurizon- Connection works between Aurizon rail network corridor and Bravis Rail network corridor
- Copper & fibre cabling works
- Pit and pipe installation
- Signalling equipment Hut foundations
- Trackside equipment installation
Value – $1.5M

Tunnel Project
Aurizon- Train detection
- Axel counter upgrade
- Trackside equipment cabinet installation
- Copper & fibre cabling works
- Pit and pipe installation
Value – $800k

Grantleigh Project
Aurizon- Train detection
- Axel counter upgrade
- Trackside equipment cabinet installation
- Copper & fibre cabling works
- Pit and pipe installation
Value – $550k