Fibre Optic Cabling
Fibre Optic Cabling
The Betta Group is a leading civil contractor with over 8 years of experience working on Fibre Optic Cabling projects. We have a highly trained and experienced team with specialist equipment to undertake all aspects of Fibre Optic Cabling in Road, Rail and Air construction projects.
We believe communication is paramount to a successful project, and we engage with the client at every level to ensure the work is completed professionally, on time and within budget.
![Fibre Optic Cabling 2 Fibre Optic Cabling](https://thebettagroup.orcoda.com/wp-content/uploads/sites/3/2022/09/Fibre-Optic-Cabling-2.png)
FIBRE OPTIC CABLING PROJECTS
![Aurizon](https://thebettagroup.orcoda.com/wp-content/uploads/sites/3/2022/10/Aurizon-2-WEBP.webp)
Tryphinia Project
Aurizon- Separable Portion No. 01 – Tryphinia Train Detection
- Separable Portion No. 02 – Tryphinia Road Level Crossing
- Separable Portion No. 03 – Mourandilla Road Level crossings
- Separable Portion No. 04 – Wallaroo Feeder Station and Dingo SER Optic fibre Installation
Value – $2.6M
![Fibre Optic Cabling](https://thebettagroup.orcoda.com/wp-content/uploads/sites/3/2022/11/Fibre-Optic-Cabling-shutterstock.webp)
Tunnel Project
Aurizon- Train detection
- Axel counter upgrade
- Trackside equipment cabinet installation
- Copper & fibre cabling works
- Pit and pipe installation
Value – $800k
![Rail Yard](https://thebettagroup.orcoda.com/wp-content/uploads/sites/3/2022/10/Aurizon-3-WEBP.webp)
Wotonga & Moranbah Yard Project
Aurizon- Train detection
- Axel counter upgrade
- Trackside equipment cabinet installation
- Copper & fibre cabling works
- Pit and pipe installation
Value – $800k
![Fibre Optic Cabling](https://thebettagroup.orcoda.com/wp-content/uploads/sites/3/2022/11/Fibre-Optic-Cabling-2-WEBP.webp)
Collinsville SER Project
Aurizon- Copper & fibre cabling works
- Pit and pipe installation
- Signalling equipment
- Hut foundation
Value – $400k
![Rail way](https://thebettagroup.orcoda.com/wp-content/uploads/sites/3/2022/10/Rail-Track-Sky.webp)
Bowen Rail Network Upgrade
Aurizon- Connection works between Aurizon rail network corridor and Bravis Rail network corridor
- Copper & fibre cabling works
- Pit and pipe installation
- Signalling equipment Hut foundations
- Trackside equipment installation
Value – $1.5M
![rail line yard](https://thebettagroup.orcoda.com/wp-content/uploads/sites/3/2022/10/Rail-track-night-.webp)
Grantleigh Project
Aurizon- Train detection
- Axel counter upgrade
- Trackside equipment cabinet installation
- Copper & fibre cabling works
- Pit and pipe installation
Value – $550k