Private Power Poles

Rail Infrastructure

Fibre Optic Cabling

Distribution Networks

Asset Maintenance

POWER INFRASTRUCTURE

The Betta Group are an end-to-end service provider for essential power and communications infrastructure, on a local level. Our 20+ years local experience ensures your projects are delivered on time, every time. We undertake both smaller subcontract work, through to multimillion-dollar projects, from both private and government organisations. We have the experience and resources to get every project in on time and on budget.

Our proven capability ensures that The Betta Group offers industry leading solutions, installations, and maintenance to all projects. Our highly skilled team delivers quality workmanship with minimum risk and ensures that your electrical infrastructure project is achieved at a competitive price and constructed on time

Our Partners

Our Clients

POWER INFRASTRUCTURE PROJECTS

Aurizon

Tryphinia Project

Aurizon
  • Separable Portion No. 01 – Tryphinia Train Detection
  • Separable Portion No. 02 – Tryphinia Road Level Crossing
  • Separable Portion No. 03 – Mourandilla Road Level crossings
  • Separable Portion No. 04 – Wallaroo Feeder Station and Dingo SER Optic fibre Installation
    Value – $2.6M
power tower

DEMOLITION OF TOWER

Aurizon

JOB: DEMOLITION OF A 28 METER STEEL LATTICE TOWER IN THE AURIZON BOLSOVER CONTAINER YARD.

The Project involved all trackside protection, HV Isolation and demarcation of the site area.

A 23 meter insulated EWP was vital for the demolition of the lattice tower. This required high-risk license to operate as well as an 80-tonne crane and an extendable semi-trailer.

The Lattice Tower was removed on time, on budget and without incidence.

Communication Tower

Hawklink Communication Towers

Aurizon

The Betta Group assembled and erected Seven Communication Towers for the Hawklink Radio Link Project for Aurizon in the Aurizon Corridor. The locations were between Gladstone and Moura at each of the Railway sightings.

The towers varied from 18 metres to 30 metres in height. Involving logistics from collection of materials from client, site establishment, foundation installation and erection of towers, installation of radio link dishes and installation of feeder cables.

Project included cable tray work, bollard installation, earthing and final ground works.

Rail way

POLE & SWITCHBOARD PROJECT

Aurizon

Aurizon engaged The Betta Group to change out 100 power poles and 50 CMP switchboards. The locations of the project varied from Winton in the Central West to Gladstone in the South and Mackay in the North.

The project scope expanded midway through the project life cycle to include HVABS Replacement, Transformer Replacement and Tower Removal.

Project completed on time and on budget with no LTI’s

Value $780k

ASSET MAINTENANCE JOY MINING

Komatsu

Joy Mining Equipment Fabrication and Repair Facility

 

We supply routine inspection and maintenance services to Komatsu’s HV & LV network, at their Joy Mining Equipment fabrication and repair facility based in Parkhurst QLD.

Works include: HV Switching, Sub Station, Switchgear, RMU, Circuit Breaker, Transformer inspections and oil sampling.

CURRAGH MINE

CURRAGH MINE HIGH VOLTAGE

Curragh Mine (Wesfarmers)

The Betta Group performed the work on the Overhead Powerlines at the Curragh Westfarmers Coal Mine at Blackwater. The Betta Group carried out all routine maintenance of the overhead poles, ABS’s, Transformers on the private Curragh 66kV/22kV Networks.

Betta Power attends any emergency breakdown or forced outages for the site. Betta Power Services also carries out any capital or new project work on the site.

Value – $500k

Aurizon

Grantleigh Project

Aurizon
  • Train detection
  • Axel counter upgrade
  • Trackside equipment cabinet installation
  • Copper & fibre cabling works
  • Pit and pipe installation

Value – $550k

Rail way

Callemondah Yard Upgrade Project

Aurizon
  • Stage 1A Copper & fibre cabling works, Pit and pipe installation, Signalling equipment Hut foundation
  • Stage 1B Copper & fibre cabling works, Pit and pipe installation, Signalling equipment Hut foundation
  • Stage 1C Copper & fibre cabling works, Pit and pipe installation, Signalling equipment Hut foundation
Rail Yard

Wotonga & Moranbah Yard Project

Aurizon
  • Train detection
  • Axel counter upgrade
  • Trackside equipment cabinet installation
  • Copper & fibre cabling works
  • Pit and pipe installation

Value – $800k

rail

Collinsville SER Project

Aurizon
  • Copper & fibre cabling works
  • Pit and pipe installation
  • Signalling equipment
  • Hut foundation

Value – $400k

rail line yard

Bowen Rail Network Upgrade

Aurizon
  • Connection works between Aurizon rail network corridor and Bravis Rail network corridor
  • Copper & fibre cabling works
  • Pit and pipe installation
  • Signalling equipment Hut foundations
  • Trackside equipment installation

Value – $1.5M

Rail Stock image

Tunnel Project

Aurizon
  • Train detection
  • Axel counter upgrade
  • Trackside equipment cabinet installation
  • Copper & fibre cabling works
  • Pit and pipe installation

Value – $800k

Loading...